
Published
01/12/2026, 14:29Another batch of special heavy mining equipment designed for a range of mining and preparatory works has been delivered to the Togolok gold deposit, which is being developed by Kumtor Operating Company CJSC.
The delivery of equipment is part of a large-scale program to equip the project, which is strategically important for the entire mining industry of Kyrgyzstan. Modern equipment is necessary for the effective and safe development of the deposit and preparation for industrial ore mining.
Currently, the following equipment is already ready for operation at the deposit site:
In addition, an additional batch of mining equipment, including new excavators, dump trucks, and loaders, is planned to be delivered to Tologol in the near future.
According to the company, the use of modern equipment will not only increase production efficiency but also ensure compliance with high industrial safety standards at all stages of gold mining.
At the same time, construction of the necessary infrastructure—production and auxiliary facilities—continues at the deposit.
We would like to add that, according to estimates by Soviet geologists, gold reserves at the Tologok deposit amount to approximately 17 tons.



